Broadway Transportation Improvements Project (Boulder)
14th Street
Tennyson St.
S. Broadway
Reconstruction/ Wesley to Yale
Airport Projects
- Grand Junction Regional
- Riverton Regional
- Gunnison-Crested Butte
30th Street Transportation Improvements Project
Conduit 74
S. Broadway
Reconstruction/ Arizona to Iowa
WYDOT - Gillette/Douglas
HWY 59
Ferril Lake at City Park
University Blvd./E. Asbury Ave. Reconstruction
Larimer Square
Hanging Lake Tunnel
Elmer's TwoMile Greenway Project
Denver Water Conduit
Project #25
Winslow Road
GCC Dacotah Cement Terminal
28th & Pearl Improvement Project
Broadway Street & Bridge Reconstruction
Foothills Parkway
& Arapahoe
Glenwood Canyon
Grand Avenue Paving
Roundabouts
Santa Fe Dr. & Belleview
Utilities
|
Conduit 74, CWC's newest utility project, began in March. Located at Smith Road and Havana in Aurora, the project includes furnishing and installing 75 linear feet of 36” steel pressure waterline pipe, 2137 linear feet of 42” steel pressure waterline,and 1140 linear feet of 12” and 16” distribution water mains in Smith Road. CWC crews will also be installing a 22” casing bore under the railroad, a 60” steel casing bore under three high-pressure petroleum lines, in addition to constructing a 30’ x 34’ underground cast-in-place concrete vault complete with 42” and 16” interior piping with electrical and mechanical components. The customer for the project is Denver Water.
The scheduled completion date is July 1, 2011.



|