CONCRETE WORKS OF COLORADO
HOME ABOUT US PROJECTS AWARDS WHAT'S NEW SAFETY IN THE NEWS  
SPACER
   
Featured Projects Denver Water Conduit Project #25
   

Denver Water Conduit
Project #25

30th Street Transportation Improvements Project

S. Broadway Reconstruction/ Arizona to Iowa

Elmer's TwoMile Greenway Project

Winslow Road

GCC Dacotah Cement Terminal

University Blvd./E. Asbury Ave. Reconstruction

28th & Pearl Improvement Project

Airport Projects
  - Grand Junction Regional
  - Riverton Regional
  - Gunnison-Crested Butte

Broadway Street & Bridge Reconstruction

Ferril Lake at City Park

Foothills Parkway & Arapahoe

Glenwood Canyon

Grand Avenue Paving

Hanging Lake Tunnel

Idaho Springs

Larimer Square

Roundabouts

Santa Fe Dr. & Belleview

Utilities

WYDOT - Gillette/Douglas
HWY 59

 

The Denver Water Conduit #25 project was located on 9th and Hoyt Street, just east of 9th and Kipling in Denver. An old 48” valve and access vault located 20 feet below the street were removed and a new 60” valve was installed. Fifty feet of the old 60” concrete pipe was also replaced to accommodate two new access manholes, a drain manhole, and a new manhole for the new butterfly valve. The new concrete steel pipe, interior and exterior lined, was welded into place.

Concrete Works only had ten days to complete this entire project. While Lakewood High School was on spring break, 9th Avenue (the high school’s main access road) was completely closed for the work. Crews worked from 7:00 a.m. to 9:00 p.m. daily to complete the project and reopen the road before school was back in session following their break.

 
   