University Blvd./E. Asbury Ave. Reconstruction
28th & Pearl Improvement Project
Airport Projects
Broadway Street & Bridge Reconstruction
Ferril Lake at City Park
Foothills Parkway & Arapahoe
Glenwood Canyon
Grand Avenue Paving
Hanging Lake Tunnel
Idaho Springs
Larimer Square
Roundabouts
Santa Fe Dr. & Belleview
Utilities
WYDOT - Gillette/Douglas
HWY 59
|
Concrete Works of Colorado crews have provided services for a variety
of smaller regional airports in Colorado and Wyoming such as the
Yampa Valley Regional Airport, the Jackson Hole Airport, the Rock
Springs Airport, the Laramie Regional Airport, the Sheridan County
Airport, the Fort Collins/Loveland Municipal Airport, and the Montrose
Regional Airport.
Walker Field
In the spring of 2008, CWC began work at Walker Field in Grand Junction. That project included an all new apron area with work including subgrade stabilization with cement treated base and full-depth, 16" thick, concrete pavement. Concrete Works' new portable concrete batch plant was set up on the site in early February and we began making trial concrete batch to be used on the project. The project was completed in June/2008.
Airport work performed by CWC typically includes the following:
• concrete panel replacements
• spall repairs
• full airport apron (airplane parking areas) reconstruction
• new airport apron paving
• runway construction
• drainage improvement
• storm sewer and inlets
• grading
• subgrade reconditioning and reconstruction
• base course material installation
The majority of all airport work typically includes full-depth
concrete pavement construction ranging in thickness from 12"
to 16".
List
of Airport Projects
|