CONCRETE WORKS OF COLORADO
HOME ABOUT US PROJECTS AWARDS NEWS SAFETY  
SPACER
   
Featured Projects Airports
   

Denver Water Conduit
Project #25

30th Street Transportation Improvements Project

S. Broadway Reconstruction/ Arizona to Iowa

Elmer's TwoMile Greenway Project

Winslow Road

GCC Dacotah Cement Terminal

University Blvd./E. Asbury Ave. Reconstruction

28th & Pearl Improvement Project

Airport Projects
  - Grand Junction Regional
  - Riverton Regional
  - Gunnison-Crested Butte

Broadway Street & Bridge Reconstruction

Ferril Lake at City Park

Foothills Parkway & Arapahoe

Glenwood Canyon

Grand Avenue Paving

Hanging Lake Tunnel

Idaho Springs

Larimer Square

Roundabouts

Santa Fe Dr. & Belleview

Utilities

WYDOT - Gillette/Douglas
HWY 59

Concrete Works of Colorado crews have provided services for a variety of smaller regional airports in Colorado and Wyoming including the Riverton Regional Airport, the Gunnison-Crested Butte Airport, Walker Field in Grand Junction, Yampa Valley Regional Airport, the Jackson Hole Airport, the Rock Springs Airport, the Laramie Regional Airport, the Sheridan County Airport, the Fort Collins/Loveland Municipal Airport, and the Montrose Regional Airport.

 

 
   
 

Grand Junction Regional Airport (Walker Field)

Walker Field 2009: Work on the reconstruction of the general aviation apron, which began in May, will include four separate phases.  The project includes the removal of the existing deteriorated asphalt (20,000 sy) and the concrete (46,000 sy) apron and their replacement with concrete pavement.  All of the concrete pavement is being placed on lean concrete base.  The project also includes 1500 lf of trench drain with storm sewer and inlets.  The project was originally planned to be constructed this summer, fall and into the spring of 2010.  However, the project completion is being accelerated and is anticipated to be completed by the end of 2009, weather permitting.

Airport work performed by CWC typically includes the following:
• concrete panel replacements
• spall repairs
• full airport apron (airplane parking areas) reconstruction
• new airport apron paving
• runway construction
• drainage improvement
• storm sewer and inlets
• grading
• subgrade reconditioning and reconstruction
• base course material installation

The majority of all airport work typically includes full-depth concrete pavement construction ranging in thickness from 12" to 16".

 

Riverton Regional Airport

 

Completed in early November of 2008, work on the Riverton Regional Airport included concrete apron reconstruction with 12” concrete pavement, taxiway reconstruction, taxiway lighting replacement and upgrades, and the sealing and restriping of the runway.  CWC’s wet batch concrete plant was brought in and used on the job. Jim Levernier was the superintendent on this 3.2 million dollar project.

 

Gunnison-Crested Butte Airport

 

The 1.2 million dollar Gunnison-Crested Butte Airport project included a complete apron reconstruction with 12” concrete pavement and the installation of a 250 LF trench drain. The project, overseen by Marc Lenart, was completed in October of 2008.

 