Denver Water Conduit
Project #25
30th Street Transportation Improvements Project
S. Broadway Reconstruction/ Arizona to Iowa
Elmer's TwoMile Greenway Project
Winslow Road
GCC Dacotah Cement Terminal
University Blvd./E. Asbury Ave. Reconstruction
28th & Pearl Improvement Project
Airport Projects
- Grand Junction Regional
- Riverton Regional
- Gunnison-Crested Butte
Broadway Street & Bridge Reconstruction
Ferril Lake at City Park
Foothills Parkway & Arapahoe
Glenwood Canyon
Grand Avenue Paving
Hanging Lake Tunnel
Idaho Springs
Larimer Square
Roundabouts
Santa Fe Dr. & Belleview
Utilities
WYDOT - Gillette/Douglas
HWY 59
|
This $6 million dollar project began in October of 2006 and included
10 inches of concrete pavement (20,000 square yards) placed throughout
the entire intersection at Foothills Parkway and Arapahoe Avenue
in Boulder, in addition to the construction of a 20-foot-wide pedestrian
underpass beneath Arapahoe along the Bear Creek greenway trail.
Other improvements included a new traffic signal and Bear Creek
flood control improvements all within and adjacent to sensitive
wetland and wildlife habitat.
At the start of the project, Concrete Works recommended and then worked within an accelerated schedule that effectively cut 200 calendar days out of the originally anticipated project duration of 457 days, reducing the entire length of the project to 257 days.
This city of Boulder project is funded by federal, CDOT, and city
of Boulder funding.
Article from CPWA magazine:
Foothills-ArapFinal.pdf
A complete project description can be found on the city
of Boulder web site:
http://www.bouldercolorado.gov |