Broadway Transportation Improvements Project (Boulder)
14th Street
Tennyson St.
S. Broadway
Reconstruction/ Wesley to Yale
Airport Projects
- Grand Junction Regional
- Riverton Regional
- Gunnison-Crested Butte
30th Street Transportation Improvements Project
Conduit 74
S. Broadway
Reconstruction/ Arizona to Iowa
WYDOT - Gillette/Douglas
HWY 59
Ferril Lake at City Park
University Blvd./E. Asbury Ave. Reconstruction
Larimer Square
Hanging Lake Tunnel
Elmer's TwoMile Greenway Project
Denver Water Conduit
Project #25
Winslow Road
GCC Dacotah Cement Terminal
28th & Pearl Improvement Project
Broadway Street & Bridge Reconstruction
Foothills Parkway
& Arapahoe
Glenwood Canyon
Grand Avenue Paving
Roundabouts
Santa Fe Dr. & Belleview
Utilities
|
This $6 million dollar project began in October of 2006 and included
10 inches of concrete pavement (20,000 square yards) placed throughout
the entire intersection at Foothills Parkway and Arapahoe Avenue
in Boulder, in addition to the construction of a 20-foot-wide pedestrian
underpass beneath Arapahoe along the Bear Creek greenway trail.
Other improvements included a new traffic signal and Bear Creek
flood control improvements all within and adjacent to sensitive
wetland and wildlife habitat.
At the start of the project, Concrete Works recommended and then worked within an accelerated schedule that effectively cut 200 calendar days out of the originally anticipated project duration of 457 days, reducing the entire length of the project to 257 days.
This city of Boulder project is funded by federal, CDOT, and city
of Boulder funding.
Article from CPWA magazine:
Foothills-ArapFinal.pdf
A complete project description can be found on the city
of Boulder web site:
http://www.bouldercolorado.gov |