Broadway Transportation Improvements Project (Boulder)
14th Street
Tennyson St.
S. Broadway
Reconstruction/ Wesley to Yale
Airport Projects
- Grand Junction Regional
- Riverton Regional
- Gunnison-Crested Butte
30th Street Transportation Improvements Project
Conduit 74
S. Broadway
Reconstruction/ Arizona to Iowa
WYDOT - Gillette/Douglas
HWY 59
Ferril Lake at City Park
University Blvd./E. Asbury Ave. Reconstruction
Larimer Square
Hanging Lake Tunnel
Elmer's TwoMile Greenway Project
Denver Water Conduit
Project #25
Winslow Road
GCC Dacotah Cement Terminal
28th & Pearl Improvement Project
Broadway Street & Bridge Reconstruction
Foothills Parkway
& Arapahoe
Glenwood Canyon
Grand Avenue Paving
Roundabouts
Santa Fe Dr. & Belleview
Utilities
|
Concrete Works of Colorado crews are
highly skilled at providing diverse utility services under a variety
of circumstances. Water line, storm sewers, and other utility work,
from the very basic to extremely complex, can be performed as new
construction or within existing conditions. Concrete Works can provide
new water and sanitary as well as existing water line and sanitary
line replacement. Concrete Works of Colorado is an approved Denver
Water Board contractor for all pipe and conduit sizes.
Please click on the links below to see photos from some
of our utility projects:
City
Park/Ferril Lake Utility Work
Boulder
Utility Work
Denver
Water-Cat Miller Reservoir Interconnect Pipeline Project
Approximately 800 lineal feet of 42” steel pressure pipe and appurtenances were installed between the Cat Reservoir and Miller Reservoir, which are separated by the South Platte River and an electrical corridor. These two reservoirs are located between 270 and I-76, and between Colorado and York on 69th Avenue. The project was completed in mid-June.
The Waterton Road Improvement Project in Douglas County began in January. The project consists of widening Dante Drive from two lanes to four, a new 170 foot long, 8 foot x 20 foot cast-in-place box in the Highline Canal, new retaining walls, new storm sewer and inlets, earthwork and new asphalt paving. The project is scheduled for completion at the end of April.
|