CONCRETE WORKS OF COLORADO
HOME ABOUT US PROJECTS AWARDS WHAT'S NEW SAFETY IN THE NEWS  
SPACER
   
Featured Projects Utilities
   

Broadway Transportation Improvements Project (Boulder)

14th Street

Tennyson St.

S. Broadway
Reconstruction/ Wesley to Yale

Airport Projects
  - Grand Junction Regional
  - Riverton Regional
  - Gunnison-Crested Butte

30th Street Transportation Improvements Project

Conduit 74

S. Broadway
Reconstruction/ Arizona to Iowa

WYDOT - Gillette/Douglas
HWY 59

Ferril Lake at City Park

University Blvd./E. Asbury Ave. Reconstruction

Larimer Square

Hanging Lake Tunnel

Elmer's TwoMile Greenway Project

Denver Water Conduit
Project #25

Winslow Road

GCC Dacotah Cement Terminal

28th & Pearl Improvement Project

Broadway Street & Bridge Reconstruction

Foothills Parkway
& Arapahoe

Glenwood Canyon

Grand Avenue Paving

Roundabouts

Santa Fe Dr. & Belleview

Utilities

Concrete Works of Colorado crews are highly skilled at providing diverse utility services under a variety of circumstances. Water line, storm sewers, and other utility work, from the very basic to extremely complex, can be performed as new construction or within existing conditions. Concrete Works can provide new water and sanitary as well as existing water line and sanitary line replacement. Concrete Works of Colorado is an approved Denver Water Board contractor for all pipe and conduit sizes.

Please click on the links below to see photos from some of our utility projects:

City Park/Ferril Lake Utility Work

Boulder Utility Work

Denver Water-Cat Miller Reservoir Interconnect Pipeline Project
Approximately 800 lineal feet of 42” steel pressure pipe and appurtenances were installed between the Cat Reservoir and Miller Reservoir, which are separated by the South Platte River and an electrical corridor. These two reservoirs are located between 270 and I-76, and between Colorado and York on 69th Avenue. The project was completed in mid-June.

The Waterton Road Improvement Project in Douglas County began in January. The project consists of widening Dante Drive from two lanes to four, a new 170 foot long, 8 foot x 20 foot cast-in-place box in the Highline Canal, new retaining walls, new storm sewer and inlets, earthwork and new asphalt paving. The project is scheduled for completion at the end of April. 

   

Community Involvement         Project Recognition         Employment         Contact Us

 

 

All Rights Reserved. Concrete Works of Colorado