Boulder CO – North Pearl Parkway Multi Use Path Reconstruction

This multifaceted project involved immense coordination and scheduling efforts. There were 6 major contractors working in the same footprint to construction 3 large buildings and 3 different parts of the roadway. The work included full removal and replacement of the 10” 2 lane road with a major storm water improvement. There was a cast in place 6’ by 15’ single cell culvert installed for 900’ long.