Antonito CO – US Highway 285 Municipal Streets Reconstruction

The award winning reconstruction of US 285 Municipal Streets and Intersections in Antonito, CO., included correcting subgrade, removing asphalt pavement and replacing it with concrete pavement. Replacement of existing storm sewer. A 60-inch conduit that flows into a newly built retention pond was installed along 8th Avenue/County Road G. Additional enhancements to the town’s infrastructure included […]

Project Details

Castle Rock CO – SH 86 – I-25 to Woodlands Boulevard Reconstruction

This award winning CDOT project, was the reconstruction of CO SH 86 from I-25 to Woodlands Boulevard, and consisted of full concrete removal and replacement at an 11” depth on a 6 lane width road with turn pockets and acceleration and deceleration lanes for 1.8 miles. The project crossed 5 major intersections, including the on and […]

Project Details

Boulder CO – North Pearl Parkway Multi Use Path Reconstruction

This multifaceted project involved immense coordination and scheduling efforts. There were 6 major contractors working in the same footprint to construction 3 large buildings and 3 different parts of the roadway. The work included full removal and replacement of the 10” 2 lane road with a major storm water improvement. There was a cast in […]

Project Details

Wheat Ridge CO – Youngfield and 32nd Street Improvements

This City of Wheat Ridge project included 10,000 CY of excavation against Interstate-70 embankments for a retaining wall and allowing widening of the roadway, widening the current roadway with full reconstruction from a 4 lane width roadway into a 6 lane width with dual turn pockets in each direction. This had to be completed with […]

Project Details

Colorado Springs Airport Taxiway M&F Reconstruction

This City of Colorado Springs project, included 30,000 SY of full depth concrete removal and replacement at a 16” depth. The extreme demands of the schedule to complete this work during the winter season in 5 months with 2 phases, 4 milestones, and $10,000 dollar per day liquidated damages made it an intimidating project. However, […]

Project Details

Cokeville WY – US Highway 30 Concrete Overlay

This WYDOT project consisted of milling and placing a 6” white-top on US Highway 30 in Cokeville, WY. The work was broken into 5 segments that carried over a 9 mile stretch of a 4 lane width. There was 2 way traffic on this busy section and was handled by a 24 hour pilot car […]

Project Details

Denver CO – Tennyson Street

This City of Denver project consisted of street-scape and street reconstruction of full ROW width on Tennyson Street from 38th Avenue to 44th Avenue.  Street-scape scope included corner bulb-outs, widened sidewalks, street lighting upgrade to current standards, pedestrian lighting, street trees, site furniture, seat walls, bike racks, and trash & recycling bins. In addition, abandoned […]

Project Details

Denver CO – Reconstruction South Broadway Street (Arizona to Iowa Avenues)

This City of Denver project included the reconstruction of South Broadway Street from Iowa Avenue to Arizona Avenue included new concrete pavement, major drainage and utility upgrades, new signalization, construction of a new raised landscape median and street-scape improvements.  Street-scape improvements to South Broadway Street included a landscaped median featuring trees and native plantings, sidewalk […]

Project Details

Denver CO – 14th Street Sidewalk and Streetscape Project

This City of Denver reconstruction project along one of the busiest corridors in downtown Denver, from Market Street  to Colfax Avenue, included widening the northern sidewalk to 19 feet and reconstructing the southern sidewalk to 16 feet. Bulb outs were added to the south side to minimize the pedestrian crossing distance across 14th Street. Improvements […]

Project Details

Grand Junction CO Regional Airport (Walker Field)

This Grand Junction Regional Airport Authority project at Walker Field Airport included the reconstruction of the general aviation apron in four separate phases. The project consisted of the removal of the existing deteriorated 20,000sy of asphalt and 46,000sy of concrete apron and repaving with concrete. In addition, the project included 1,500lf of trench drain with […]

Project Details