The award winning reconstruction of US 285 Municipal Streets and Intersections in Antonito, CO., included correcting subgrade, removing asphalt pavement and replacing it with concrete pavement. Replacement of existing storm sewer. A 60-inch conduit that flows into a newly built retention pond was installed along 8th Avenue/County Road G. Additional enhancements to the town’s infrastructure included […]
Eagle County Regional Airport Apron And Infield Reconstruction
This FAA project included three separate schedules of work lasting over two working seasons. The highlighted work on the apron and air infield improvement project is 61,500 SY of 4″ lean concrete and 16.5 “full strength concrete removal and replacement.
Castle Rock CO – SH 86 – I-25 to Woodlands Boulevard Reconstruction
This award winning CDOT project, was the reconstruction of CO SH 86 from I-25 to Woodlands Boulevard, and consisted of full concrete removal and replacement at an 11” depth on a 6 lane width road with turn pockets and acceleration and deceleration lanes for 1.8 miles. The project crossed 5 major intersections, including the on and […]
Boulder CO – North Pearl Parkway Multi Use Path Reconstruction
This multifaceted project involved immense coordination and scheduling efforts. There were 6 major contractors working in the same footprint to construction 3 large buildings and 3 different parts of the roadway. The work included full removal and replacement of the 10” 2 lane road with a major storm water improvement. There was a cast in […]
Wheat Ridge CO – Youngfield and 32nd Street Improvements
This City of Wheat Ridge project included 10,000 CY of excavation against Interstate-70 embankments for a retaining wall and allowing widening of the roadway, widening the current roadway with full reconstruction from a 4 lane width roadway into a 6 lane width with dual turn pockets in each direction. This had to be completed with […]
Colorado Springs Airport Taxiway M&F Reconstruction
This City of Colorado Springs project, included 30,000 SY of full depth concrete removal and replacement at a 16” depth. The extreme demands of the schedule to complete this work during the winter season in 5 months with 2 phases, 4 milestones, and $10,000 dollar per day liquidated damages made it an intimidating project. However, […]
Cokeville WY – US Highway 30 Concrete Overlay
This WYDOT project consisted of milling and placing a 6” white-top on US Highway 30 in Cokeville, WY. The work was broken into 5 segments that carried over a 9 mile stretch of a 4 lane width. There was 2 way traffic on this busy section and was handled by a 24 hour pilot car […]
Boulder CO – Broadway Street (Euclid to 18th) Transportation Improvements Project
This City of Boulder, CO project significantly improved the safety and mobility of a highly traveled and congested area in Boulder. A busy and dynamic stretch of road with 30,000 cars, 1280 buses, and several thousand pedestrians and cyclists utilizing the highway every day. Major work items included roadway concrete and HMA pavement removal and […]
Denver CO – Tennyson Street
This City of Denver project consisted of street-scape and street reconstruction of full ROW width on Tennyson Street from 38th Avenue to 44th Avenue. Street-scape scope included corner bulb-outs, widened sidewalks, street lighting upgrade to current standards, pedestrian lighting, street trees, site furniture, seat walls, bike racks, and trash & recycling bins. In addition, abandoned […]
Denver CO – Reconstruction South Broadway Street (Arizona to Iowa Avenues)
This City of Denver project included the reconstruction of South Broadway Street from Iowa Avenue to Arizona Avenue included new concrete pavement, major drainage and utility upgrades, new signalization, construction of a new raised landscape median and street-scape improvements. Street-scape improvements to South Broadway Street included a landscaped median featuring trees and native plantings, sidewalk […]
Denver CO – 14th Street Sidewalk and Streetscape Project
This City of Denver reconstruction project along one of the busiest corridors in downtown Denver, from Market Street to Colfax Avenue, included widening the northern sidewalk to 19 feet and reconstructing the southern sidewalk to 16 feet. Bulb outs were added to the south side to minimize the pedestrian crossing distance across 14th Street. Improvements […]
Grand Junction CO Regional Airport (Walker Field)
This Grand Junction Regional Airport Authority project at Walker Field Airport included the reconstruction of the general aviation apron in four separate phases. The project consisted of the removal of the existing deteriorated 20,000sy of asphalt and 46,000sy of concrete apron and repaving with concrete. In addition, the project included 1,500lf of trench drain with […]